都是恩典
All of Grace

北德華人教會十幾年來,聚會地點變換了幾次,聚會的弟兄姊妹也變換無數,然而承蒙神的恩典,神一直伴隨著北德華人教會的成長。北德華人教會要擁有自己屬神的家的夢想,也未曾斷過。

當去年我們決定開始尋找自己屬靈的家時,最大的問題是為何我們要有自己的家?為什麼要現在?經過幾次的溝通及禱告,包括會友的意見調查(survey),神自己將這建堂的異象,逐漸的建立在每個弟兄姊妹的心中。

當整個會眾能分享這個異象,接下來的問題是:如何去找這樣的家?無論是找現有的場地或空地,都要有房地產的專業知識。我們並沒有這方面的知識。幸好天父十分眷顧我們,及時差派祂的僕人Raymond弟兄來幫助我們。經過了八個月的努力,終於找到了現在的8.9英畝的美地。我們實在難以置信這塊地不是神所賜的:它如世外桃園般的樹木草地,它的地理位置,及它的價錢,真的是遠超過我們所求所想的。這再次映証了神的應許

找到了地,接下來的問題是:如何給付頭期款?我們只有少於3個月的時間,得付出25萬的目標。弟兄姊妹日以繼夜的趕工,40天禁食禱告,本地及海外的捐款活動,Garage Sales 等等。經過全教會齊心的努力,終於如期在7月18日完成購買手續。這如奇蹟的購地過程,第三次印証神的供應

現階段是建堂計劃的最後階段 - 建堂!從這裡開始,建堂將進入專業化的建築業領域。我們很高興有建築結構專業的兩位弟兄加入建堂委員。我們預計十一月中中能決定建築師及土木工程師。接下來可分為兩大步驟:

    1. 送審建築藍圖:建築師與土木工程師與 Town of Flower Mound 交涉,拿到建築許可 (Building Permit)。因 Flower Mound 風評有嚴格的建築標準,估計建築許可約需 8-12 個月。
    2. 建造工程:拿到建築許可,我們必需找包商 (Contractor) 來建造。估計建造工程約需 4-6 個月

我們在這整個過程中,已經分享到神的異象,見証到神的應許,及神的供應。在這最後的建堂工程,我們更需要全體會眾的合一及禱告。誰知道呢?如果是神的應許,北德華人教會將在自己的會堂慶祝 2006 聖誕節!

For many years, NTCC has changed worship place several times. Brothers and sisters come and go. But thanks to God’s grace, He is always with NTCC. The dream to have a place to call home, our spiritual home, never dies.

When we determined to look for our place to call home, the biggest questions we asked ourselves were: Why we need a place to call home? Why now? After numerous sharing and praying, including a member survey, God gradually planted this vision into each every one of us.

When we shared the same vision among us, the next question was: How to find a place to call home? We didn’t have any expertise in real estate at all! Thankfully, God had sent his own servant, brother Raymond, to help us. After eight months of continuous search, we found this 8.9-acre promised land. Without a doubt this is the land promised by God: the beautiful park-like landscape, the outstanding location, and the incredible price. We had witnessed God’s promise once again.

Once we found the land, the next question is: How to pay for it? We had less than three months to come up with $250,000. Brothers and sisters worked diligently together- forty-day fasting, local and overseas fund raising events, Garage Sales, etc. Through the unity of our church, we miraculously reached our financial goal and close the transaction on July 18th. This time we had witnessed His provision.

Now we are at the final phase: building the church! From now on, we will rely on construction professionals. We are very glad that two brothers are lending their structure engineering expertise to the project. We plan to select an architect and a civil engineer firm by middle of November. The actual building phase can be divided into two steps:

    1. obtain building permit: architect and civil engineer have to meet with Town of Flower Mound to obtain building permit. It will be an arduous long process. We estimate the process will take about eight (8) to twelve (12) months because Flower Mound has strict building codes.
    2. construction: we must find contractors to construct our building after obtaining building permit. We estimate the whole construction will take four (4) to six (6) months.

Through the whole process, we share the same vision. We experience God’s presence with God’s promise and His provision. At the last stage of building project, we earnestly need the unity of our church and prayer from you. Who knows, if this is His plan, NTCC may celebrate 2006 Christmas at a place we call home!

 

 